The steel structure warehouse built with light steel structure can also play a role in environmental protection, because the cost of water and soil resources is far lower than that of traditional cement warehouse, and in this kind of buildings, building materials are the most environmentally friendly color steel building materials on the market, so it plays a very good protection role for the environment.
For the whole building group, this kind of building materials is undoubtedly the most popular mainstream building materials in today's society.
Its thermal insulation effect is very significant, put things in it do not have to worry about any problems, so for the steel structure warehouse to strengthen the protection of the main body of the light steel structure will not cause any problems because of the temperature difference outside, so that it has achieved the role of corrosion insulation, prolong its service life.
| Material List | |
|---|---|
| Project | Steel Structure Building |
| Size | According to Customer Need |
| Main Steel Structure Frame | |
| Column | Q235B, Q355B Welded H Section Steel |
| Beam | Q235B, Q355B Welded H Section Steel |
| Secondary Steel Structure Frame | |
| Purlin | Q235B C and Z Type Steel |
| Knee Brace | Q235B C and Z Type Steel |
| Tie Tube | Q235B Circular Steel Pipe |
| Brace | Q235B Round Bar |
| Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe |
| Roof and Wall System | |
| Roof Clading | Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool) |
| Wall Clading | Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool) |
| Door | Sandwich Panel Sliding Door/Rolling Metal Door |
| Window | Aluminium Alloy Window/PVC Panel Window |
Our company is a professional steel structure fabrication and engineering company, which integrates steel structure design, research and development, manufacturing and installation. The project types include prefabricated steel workshop, warehouse, logistics park and other light steel structure of the civil building system, high-rise residential buildings, exhibition center, stadium, airport station and bridge, Power plant, chemical plant, oil and gas, mining, etc.
Our steel structure processing plant now covers an area of 35,000 square meters, plant 20,000 square meters. More than 100 employees. The monthly production capacity for steel structure is more than 1500 Tons. Our steel structure components include light/heavy H steel, BOX steel, Cross shaped section steel, large diameter submerged arc straight-weld pipe, steel model structure, C/Z purlin and machining fitting components. There are three subordinate steel structure companies, which have passed and strictly implemented ISO9001:2008 quality management system, ISO14001:2004 environmental system, GB/T28001:2001 occupational health system, and obtained ASTM certification, and international SGS product certification. Obtained the right of export, design, installation and consultation.
Quality first, Technology ahead, Innovation continually is our entrepreneurial concept. We build strong relationships of trust with our clients, truly understanding their needs and bringing them the most reasonable solutions.
We are a manufacturing factory. You are welcome to visit our production facilities at any time. Our quality control workflow and experienced sales team will demonstrate our professionalism. You will also get the most competitive factory-direct pricing.
Our core business objectives are to offer the best price with the same high level of quality, and the best quality at the same price. We optimize every production step to minimize your costs and guarantee the best returns on your investment.
Yes. We provide detailed installation drawings for free. We can also dispatch engineers as installation directors or send a complete assembly team upon request to facilitate onsite work.
Absolutely. You are welcome to send an independent inspector to check container loading, as well as monitor any stage of our manufacturing processes.
Yes, we design comprehensive solutions based on your requirements. By utilizing advanced design software like AutoCAD, PKPM, MTS, 3D3S, Tarch, and Tekla Structures (Xsteel), we can design complex industrial projects, office buildings, supermarket complexes, and hotels.
Delivery times depend directly on the total order quantities. On average, the delivery time to a domestic seaport in China is around 40 days after we receive the project deposit.